
We recently carried out a complete shower installation in a Nottingham property as part of a bathroom upgrade.
The project included installing a new shower mixer valve, rail system and modern rainfall shower head. Our plumber carefully connected the system to the existing hot and cold water supply while ensuring correct pressure and temperature control.
All pipe connections were sealed and tested before the final installation was completed.
Work completed:
- Installation of shower mixer valve
- Rainfall shower system fitting
- Pipe connections and sealing
- Full pressure testing
The result is a modern and reliable shower system that provides consistent water flow and temperature.






